How do simply estimate the focus factor of a project in Jira Atlassian last year?

I think you are familiar with the book Henrik Kniberg "Scrum and XP from the Trenches" where the formula in the cover image (and others) was taken. So, despite the difficulties of 2022, we continued to work on developing our pet project.


According to official data, the number of working days in 2022 was 257. This is the data for the denominator in the formula - available man-days.


Use the Timesheet Tracking for Jira to know еру data for the numerator in the formula - actual velocity. Actual velocity is the sum of the initial estimates of all stories completed in the last sprint.


I took the data for the last 2022 year, which equals 697 hours or 87.125 days.


Focus factor = 87.125 / 257 = 0.339 or 33.9% last 2022.


What does this number mean? Do you think this is good or bad? How to apply it?


The focus factor is an estimate of how focused the team is. A low focus factor may mean that the team expects many disturbances or expects their time estimates to be optimistic.


The pet project took 33.9% of the time, meaning 8 * 0.339 = 2.71 hours of extra work every weekday or on weekends in the demanding conditions of 2022.


The example in the book shows a focus factor value of 40% for a dedicated project, so 33.9% for the pet project is an excellent value. Though, the default focus factor Henrik Kniberg uses for new teams is usually 70% since that is where most of our other teams have ended up over time.


I can use the value of the focus factor to calculate the estimated velocity.



Thus, if in 2023 we have 250 working days and a backlog with tasks estimated at 1000 hours (125 days) and the situation does not improve, then:

1) in 2023, we predict completing only 84.75 days (678 hours),

2) the remaining 40.25 days (322 hours) we predict to complete in 2024.


Look at the focus factor and actual velocity from the last sprint or any period. Next, look at your total resource availability this sprint or any period and estimate a focus factor. Discuss any differences between these two focus factors and make adjustments as necessary.


2023.05.03
वलेरी कोसेन्को
उत्पादन मालक सास पाळीव प्राणी प्रकल्प sdtest®

१ 199 199 in मध्ये वलेरी एक सामाजिक पेडोगॉग-सायकोलॉजिस्ट म्हणून पात्र ठरली होती आणि त्यानंतर त्यांनी प्रकल्प व्यवस्थापनात आपले ज्ञान लागू केले.
व्हॅलेरीने २०१ 2013 मध्ये पदव्युत्तर पदवी आणि प्रकल्प आणि प्रोग्राम मॅनेजर पात्रता प्राप्त केली. आपल्या मास्टरच्या कार्यक्रमादरम्यान, तो प्रोजेक्ट रोडमॅप (जीपीएम ड्यूश गेसेल्सचफ्ट फर प्रोजेक्ट मॅनेजमेंट ई. व्ही.) आणि सर्पिल डायनेमिक्सशी परिचित झाला.
व्हॅलेरीने विविध सर्पिल गतिशीलता चाचण्या घेतल्या आणि एसडीटीस्टची सध्याची आवृत्ती अनुकूल करण्यासाठी त्याचे ज्ञान आणि अनुभव वापरले.
वॅलेरी हे व्ही.यू.सी.ए. च्या अनिश्चिततेचा शोध घेण्याचे लेखक आहेत. मानसशास्त्रातील सर्पिल गतिशीलता आणि गणिताची आकडेवारी वापरुन संकल्पना, 20 हून अधिक आंतरराष्ट्रीय मतदान.
या पोस्टमध्ये आहे 0 टिप्पण्या
प्रत्युत्तर द्या
उत्तर रद्द करा
आपली टिप्पणी सोडा
×
त्रुटी शोधा
आपल्या योग्य आवृत्ती प्रस्तावित
इच्छित म्हणून आपला ई-मेल प्रविष्ट करा
पाठवा
रद्द करा
Redirect to your region's domain sdtest.us ?
YES
NO
Bot
sdtest
1
नमस्कार! मला विचारू द्या, आपण आधीपासूनच आवर्त गतिशीलतेशी परिचित आहात?